Guided Wave Testing Procedure
MsS guided wave testing is performed by the following procedure:
- Identify and record the pipe (pipe section, pipeline, etc.). Verify.
- Clean the pipe. Wipe off any dirt or loose corrosion with a paper towel. If the surface is rough, use a wire brush or sandpaper to smooth the surface and then clean.
- Prepare the FeCo strip to fit the circumference of pipe.
- Attach the strip around the pipe circumference using shear couplant, mechanical dry coupling, or epoxy bonding.
- Condition the strip for torsional-mode operation.
-
A continuous probe covers the entire circumference of a pipe:
- Excellent direction control
- Zero near-field length
- Place the MsS probe over the strip.
- Connect MsS probe to MsS equipment.
- Acquire data.
- Monitoring Only Find the best center frequency and wrap electric wires for that frequency operation.
- Monitoring Only Acquire baseline data for long-term monitoring after reinstalling insulation or recovering of soil.
- Analyze data and finalize report.